• Cross Country Aldur Gas Pipe Line of 14.5 Kms.
• Storage Tanks-11 Nos. to Bapco
• Manufactured more than 2,800 Item of Process Equipment to date.
• Biggest construction project peaked at 1,200 workers.
• Biggest Shutdown project peaked at 1,000 Workers.
• Manufactured 2 Incinerators (7m Dia. x 70m Long, 465 Tons).
• Manufactured Desalination Plants for Indonesia, Bahrain and Qatar.
• Stack Replacement in a running plant (6m Dia. x 80m Long, 380 Tons).
• Manufactured 2 Columns (4m Dia. x 37m Long x 91mm Thick, 350 Tons).
• Manufactured Column (4.5m Dia. x 80m Long, 324 Tons).
• Manufactured Converter (17m Dia. x 37m Long, 494 Tons).
• Manufactured 4 Stacks (7.5m Dia. x 60m Long, 20 Tons)